SolarEdge Technologies is a leader in smart energy solutions, specialising in advanced inverter systems that elevate solar power performance. Known for maximising energy yield while cutting costs, SolarEdge products make solar energy more efficient and accessible for residential and commercial users. Their innovative technology, including power optimizers, inverters, and monitoring platforms, supports real-time tracking and energy efficiency, facilitating the shift towards clean, renewable energy sources.
S1000-1GMXMBT - SolarEdge S1000 Optimiser -1000W 18 A, 125 VDC LONG LEAD
The SolarEdge S1000 Optimiser is a premium module-level power optimiser tailored for large-scale solar installations. With a 1000W capacity, it connects two photovoltaic (PV) panels (up to 500W each) in series, reducing the number of optimisers needed and lowering overall installation costs. Delivering an exceptional 99.5% efficiency, this optimiser uses advanced Maximum Power Point Tracking (MPPT) technology to optimise energy production and boost solar system revenue.
Equipped with cutting-edge "Sense Connect" technology, the S1000 ensures advanced safety by monitoring cable and connector temperatures to prevent potential arc faults. Its SafeDC™ feature further enhances safety by automatically reducing high DC voltage to touch-safe levels during grid or inverter shutdowns.
Key Features:
| Brand | Solar Edge |
| Type | Optimisers |