Sunsynk 5.32kWh Sunsynk Battery IP65 with long lead

Item Code: SUN-BATT-5.32-IP65

Quantity
(4 available)
Share

Sunsynk is a leading manufacturer of advanced solar inverters and energy storage solutions, known for its innovative hybrid technology and efficient energy management systems. Their products seamlessly integrate solar, battery storage, and grid power, offering reliable, sustainable solutions for residential and commercial energy needs.

SUN-BATT-5.32-IP65 - Sunsynk 5.32kWh Sunsynk Battery IP65 with long lead

The SUN-BATT-5.32-IP65 by Sunsynk is a high-capacity 5.32kWh lithium iron phosphate (LiFePO₄) battery, designed for efficient energy storage in solar power systems. This battery is built with an IP65-rated enclosure, making it highly weatherproof and dustproof, perfect for both indoor and outdoor installations. Featuring advanced battery management, it provides optimal performance, safety, and long-lasting reliability, ideal for residential and small commercial energy needs.

Key Features:

  • High Storage Capacity: 5.32kWh, suitable for both residential and small commercial use.
  • Lithium Iron Phosphate Technology: Offers enhanced safety, high thermal stability, and a longer cycle life.
  • IP65-Rated Enclosure: Weatherproof design to withstand dust, rain, and varying environmental conditions.
  • Advanced Battery Management System (BMS): Protects against overcharging, discharging, and balances cells to extend battery lifespan.
  • Long Lead Cable Design: Provides flexibility during installation, allowing easier connections in challenging layouts.
  • Modular and Stackable: Easily expandable by connecting multiple units for increased capacity.
  • Efficient Charging and Discharging: Compatible with various inverters, supporting fast charge and discharge cycles.
  • High Cycle Life: Rated for over 6,000 cycles, offering extended durability.
  • Safety Features: Built-in protections against short-circuiting, overheating, and overloading.
  • Sunsynk 5.32kWh IP65 Datasheet / File size: 0.24 MB
  • Sunsynk 5.32kWh IP65 User Manual / File size: 3.35 MB